Location

The property is ideally located in the heart of the Rhine-Neckar area. The nearest freeway access (A62 Schifferstadt) to the A65 can be reached in approx. 4 km without passing through the town.

The A5 and A6 motorways can be reached in 20 minutes by car. A large workforce potential, generous residential and commercial areas as well as an above-average purchasing power characterize the Rhine-Neckar region as a strategically favorable location.

Ketzerweg 1
67105 Schifferstadt
Germany

53,412

Clear Height
12m

574,921

SITE & BUILDING SPECS

53,412

574,921

Total Size of Property 97,239 SQ M
(1046,672 SQ FT)
Warehouse 42,025 SQ M
(452,353 SQ FT)
Offices 1,937 SQ M
(20,850 SQ FT)
Mezzanine 8,450 SQ M
(90,955 SQ FT)
Car parking spaces
124
Trailer parking spaces
35
Dock Doors
40
Drive in Ramps
4
Floor loading capacity
7t/m²
Clear Height
12 m
ESFR-Sprinkler-System FM Global

Economic Region

The Rhine-Neckar metropolitan region is located between the Rhine-Main and Stuttgart metropolitan areas and is one of the most important business locations in Germany. Traditionally strong are the chemical, electrical and mechanical engineering industries as well as pharmaceutical and medical technology. The metropolitan region is crossed by important European east-west and north-south transport routes and is a sought-after location for logistics and distribution.

The Schifferstadt site has excellent transport links to the A5 / A6 Rhine-Neckar freeway interchange. Large cities in the region such as Mannheim, Germersheim and Ludwigshafen have high-performance cargo handling ports on the Rhine which enable transport to the major overseas ports in Northern Europe by water.

LOCATION AND TRAVEL DISTANCES

Destination Km
Highway access A61
4
Mannheim
26
Heidelberg
56
Karlsruhe
65
Destination Km
Frankfurt airport
99
Frankfurt
108
Stuttgart
149

SUSTAINABLE EXCELLENCE

GLP’s logistics- and distribution properties meet high sustainability criteria worldwide through environmentally sound building solutions. All new developments in Germany are certified to at least the DGNB Gold standard, making them more cost-effective to operate and maintain. In addition to reducing operating costs for users, GLP contributes to sustainability by improving the CO2 balance, reducing energy and water consumption, and selecting certified and recyclable building materials.

Contact

    Please contact me via: E-MailTelephone

    I agree that my data from the contact form are raised and processed to the answer of my inquiry. The data will be deleted after your request has been processed.

    *required

    Michael Gerke

    Head of Development Germany

    Taunusanlage 1 – Skyper, 18. OG
    60329 Frankfurt am Main
    Germany